Phase 6

Maintenance

Control spec drift after deployment: verify shipped code, classify feedback, and route each signal back to the right SDLC phase.

Detect drift

Compare deployed stories against locked specs, runtime contracts, tests, and synced repository context.

Conformance and regressions

Classify signals

Separate implementation bugs, business change requests, spec gaps, and unresolved evidence before acting.

Evidence first

Route back

Send each signal to discovery, design, implementation, testing, deployment, or the permanent fix log.

Controlled loop-back

Sign in and select a project to run a conformance check.